Sunday, December 9, 2007

PRIMAVERA P6 COURSE CURRICULAM

PRIMAVERA PROJECT MANAGEMENT V 6.0 CURRICULUM

Duration 4 FULL DAYS FROM 10 AM TO 7 PM
PART 1

Introduction to Project Management Concepts
Project Management processes
Project Knowledge Areas
OBS (organizational Breakdown Structure)
Different Views
To create new OBS
Restrictions


EPS (Enterprise Project Structure)

Different views.
To Create new
Assigning the responsible manager
Difference between EPS & OBS

Projects

Overview of the Project
Creation of new project through wizard
Creation of new project through details
Calendar Global, Resource, Project.
New Calendar
Modification, Copying holidays from global.
Making a Project or resource Calendar as global.
Assigning a Calendar as default for the projects.

PART 2

Entering Activities through Wizard
Entering Activities through details
Explore the use of duration format including sub unit
Mile Stones, Activity Type
Inserting a new Column
Moving the Columns
Time Scale adjustments
Different kind of relationship between tasks
Different methods of linking
Estimating the project finish date
Identifying the project critical path
Editing the task links


Applying different calendars to activities & Estimating the finish date

Constraints in a Project.
Different types of Constraints Use of Secondary Constraint

Work Breakdown Structure (WBS)
What is WBS
Example for WBS
Defining WBS Structure
Applying WBS for tasks

Activity Codes
Code Definition
Assigning Code and Organizing.
Reorganizing

Project Codes
Code Definition
Assigning Code and Organizing.
Reorganizing

Resource Codes
Code Definition
Assigning Code and Organizing.
Reorganizing


PART 3

Work Products & Documents
Defining WPs & Docs
Difference between WP & Doc
Assigning it for activities.

Currency

To change the currency
To Create new Currency-
Setting exchange rate
To find the rate of project in another currency value.
Roles
Importance of Roles
Defining the roles
Giving rates for the roles


Resource Sheet Preparation

Defining Resource through Wizard
Defining Resource through detail
Defining Resource through Calendar
To create new unit of Measure for materials which are not available in the List

Resource Assigning

Through add roles
Through add resources
Giving different rate which has not mentioned either in resource or role.

PART 4

Resources Analysis
Resource Usage Profile
Resource Usage Spread Sheet
Resource Curves
Resource Leveling
Concepts of Stretching, Crunching & Splitting – Manual
Automatic Leveling

Updating Progress

Setting Database
Entering Actual Start & Actual Finish date for tasks
Updating through duration
Updating through Physical % Complete
Updating through Units
Updating Cost
Comparative Study of Baseline and Actual Plan
Calculating earned Value analysis

PART 5

Filter
Global Change
Reports
Tabular
Graphical
Import / Export
Formatting Bars
User defined fields
Methodology Management

1 comment:

Core2Duo said...

hi sir, i want to take this training, i'm Egyptian working in Saudia Arabia in a project and the project management company for the project is TURNER i'm using primavera 3 and want to update myself to Primavera 6 .
My work was in Updating Schedules, Weekly Reports, Cost loading.
so how can i join ur training?